As we had planned, many of the main elements of the original layout are still intact, eg., 
the mountain, the tunnel, the logging operation and the town itself.  But, the inner loop 
route required a complete modification of the former reservoir area.  It is now a lake 
over which the two bridges pass. Note the placement of a new hill. 
Also, some elevation posts were needed to bring the train down to level grade before it 
crosses over the removable insert onto the "island."   

As the saying goes, "Don't try this at home,"  (unless you are retired).